The maximum water absorption limit for a second-class brick is?
Who is the father of concrete technology?
What is an example of a rotary kiln fuel?
The planners should aim to achieve a target to _____ percentage of the plinth area.
Which of the following coaster should be deducted from initial cost in ownership cost
What does the abbreviation 'EMD' stand for?
As per IS specifications, what should be the maximum final setting time for ordinary Portland cement?
From the below statement which is the false statement about flexible pavement in road construction
In which construction are second-class bricks used?
The optimistic time (O), Most Likely time (M) and Pessimistic time (P) in days of the given activities in the critical path are given below in the format O-M-P.
The expected completion time in days (in integer) of the project is ___________.