The dry mixing of concrete is done for minimum

1
2
3
4

Solution:

The whiteness of white cement is measured using the _______ scale.

1
2
3
4

Solution:

A brick that has been cut in half along its length is called a?

1
2
3
4

Solution:

Which of the following vibrator is also called as poker vibrator?

1
2
3
4

Solution:

What are the essential requirements of a valid contract?

1
2
3
4

Solution:

What is the particle size range of silt?

1
2
3
4

Solution:

Which type of cement is used for making sleepers for Indian Railways?

1
2
3
4

Solution:

What is concrete?

1
2
3
4

Solution:

Supplementary Estimate is required due to?

1
2
3
4

Solution:

An activity has an optimistic duration of 16 days, a pessimistic duration of 27 days, and a most likely duration of 18 days. What is the expected time and standard deviation (in days) for this activity?

1
2
3
4

Solution: