Highway-pavements Questions Set 32:

Quiz Mode

Tar is a by-product of __________

1
2
3
4

Solution:

The highest CBR number is required for __________

1
2
3
4

Solution:

In the initial stage of construction which type of pavement is cheap?

1
2
3
4

Solution:

The layer which is constructed above embankment is called __________

1
2
3
4

Solution:

What is the most common waste material used in construction?

1
2
3
4

Solution:

The IRC has specified maximum stripping value of aggregates should NOT exceed ______

1
2
3
4

Solution:

The flash point temperature (degree C) of paving grades of bitumen as per the Indian standard is:

1
2
3
4

Solution:

For places where there is a passage of flood water then the highway has to be built on __________

1
2
3
4

Solution:

In a CBR test, the load sustained by a remoulded soil specimen at 5 mm penetration is 120 kg. The CBR value of the soil will be__________(in Percentage, round off upto 2 decimal places)

Solution:

The Los Angels abrasion value requirement for coarse aggregates used in water-bound macadam for the base course is:

1
2
3
4

Solution: