The weaving manoeuvres is a type of ?
In which year was the Indian Roads Congress (IRC) formed?
The specific gravity of paving bitumen as per IS: 73-1992 lies between
The stability of slopes is considered while designing which type of roads?
For aggregates to be used in wearing courses, the maximum permissible impact value should not exceed _____percent.
Select the strength parameter of concrete used in design of plain jointed cement pavement
from the following choices
According to PIEV theory, the total reaction time of the driver is split into 4 parts. The time taken by the driver for the final action such as break application is known as
In a town signal at the Ramadas road and Ghokale road, the traffic signal has been designed for a 25-second cycle based on a 30-minute traffic count of 300 and 200 vehicles, respectively. Assuming 2.5 seconds per vehicle, the total yellow signal time will be:
Calculate the length of the transition curve using the rate of change of centrifugal acceleration from the following data. Design speed = 65 km/hr, radius of the circular curve = 220 m, pavement width including extra widening = 7.5 m. Allowable rate of introduction of superelevation, 1 in N = 1 in 150.
A priority intersection has a single lane one way traffic road crossing an undivided two lane two-way traffic road. The traffic stream speed on the single lane road is 20 kmph and speed on the two-lane road is 50 kmph. The perception-reaction time is 2.5s, coefficient of longitudinal friction is 0.38 and acceleration due to gravity is 9.81m/s. A clear sight triangle has to be ensured at this intersection. The minimum lengths of the sides of the sight triangle along the two-lane road and the single lane road, respectively will be