Does the water content affect on strength of concrete?
Stripping vale test is used to determine
What is the particle size of clay?
Which of the following process is very much important to remove water voids from the concrete
The expected output of a stonemason for the work item 'Ashlar stone dressing' is:
The radial splits, which are wider on the outside of the log and narrower towards the pith, are known as
The concrete work for the following part of the building of specified thickness is measured in square meters ______.
Which of the following is a principal of construction plant layout
Which of the below condition will be happen if there is increase in the water cement ratio of concrete?
For a construction project, the mean and standard deviation of the completion time are 200 days and 6.1 days, respectively. Assume normal distribution and use the value of standard normal deviate z = 1.64 for the 95% confidence level. The maximum time required (in days) for the completion of the project would be